Inspection and people
  1. A competent person inspected the scaffold for visible defects before this shift (and again after anything that could affect its structure). 1926.451(f)(3)

  2. It was erected, moved or altered under the supervision of a competent person, by experienced and trained workers that person selected. 1926.451(f)(7)

  3. Everyone working on it has been trained by a qualified person on the hazards of this type of scaffold. 1926.454(a)

Footing, structure and load
  1. Legs, posts, frames and uprights bear on base plates and mud sills or another adequate firm foundation. 1926.451(c)(2)

  2. Footings are level, sound and rigid, and are not settling or shifting under the load. 1926.451(c)(2)(i)

  3. No unstable objects (loose bricks, blocks, boxes) are supporting the scaffold or its platforms. 1926.451(c)(2)(ii)

  4. The scaffold is plumb and braced so it cannot sway or shift. 1926.451(c)(3)

  5. If it is more than 4 times as tall as its base is wide, it is guyed, tied or braced: per the manufacturer, or at the 4:1 height and then every 20 feet (3 feet wide or less) or 26 feet (wider). 1926.451(c)(1)

  6. Parts from different manufacturers are mixed only where they fit together without force. 1926.451(b)(10)

  7. No part is damaged or weakened; anything that is has been repaired, replaced, braced or removed from service. 1926.451(f)(4)

  8. It is not loaded beyond its maximum intended load or rated capacity, whichever is less. 1926.451(f)(1)

Platforms and planks
  1. Each working level is fully planked or decked, with no gap over 1 inch between planks or between the platform and the uprights. 1926.451(b)(1)(i)

  2. Platforms and walkways are at least 18 inches wide (12 inches for ladder jack, top plate bracket, roof bracket and pump jack scaffolds). 1926.451(b)(2)

  3. Each plank end is cleated or restrained, or extends at least 6 inches past the centerline of its support. 1926.451(b)(4)

  4. Planks 10 feet long or less overhang their support by no more than 12 inches, unless designed to carry the load or guarded. 1926.451(b)(5)(i)

  5. The front edge of each platform is no more than 14 inches from the face of the work, or guardrails or personal fall arrest are in use. 1926.451(b)(3)

  6. Wood platforms are not covered with paint or another opaque finish (edges may be marked). 1926.451(b)(9)

  7. Platforms are clear of debris. 1926.451(f)(13)

  8. Platforms are free of snow, ice or other slippery material (work only to remove it). 1926.451(f)(8)

  9. Nobody is standing on boxes, barrels or ladders on the platform to reach higher. 1926.451(f)(14)

Access
  1. Where a platform is more than 2 feet above or below the access point, there is a ladder, stair tower, ramp or other proper access. 1926.451(e)(1)

  2. Nobody is climbing the crossbraces. 1926.451(e)(1)

  3. Hook-on and attachable ladders have their bottom rung no more than 24 inches above the scaffold supporting level. 1926.451(e)(2)(ii)

Fall protection and falling objects
  1. Everyone more than 10 feet above a lower level is protected by guardrails or a personal fall arrest system. 1926.451(g)(1)

  2. Guardrails are on all open sides and ends of platforms. 1926.451(g)(4)(i)

  3. Top rails are 38 to 45 inches above the platform (supported scaffolds made or placed in service after January 1, 2000). 1926.451(g)(4)(ii)

  4. Midrails sit about halfway between the top rail and the platform. 1926.451(g)(4)(iv)

  5. People below are protected from falling tools and debris: the area is barricaded, or there are toeboards, screens, nets or a canopy. 1926.451(h)(1)

  6. Toeboards, where used, are at least 3½ inches high and fastened at the outer edge of the platform. 1926.451(h)(4)(ii)

  7. Everyone on the scaffold is wearing a hard hat. 1926.451(h)(1)

Around the scaffold
  1. The scaffold and anything conductive handled on it stay clear of power lines: at least 3 feet from insulated lines under 300 volts, and 10 feet from insulated lines up to 50 kV and from any uninsulated line under 50 kV (more above 50 kV). 1926.451(f)(6)

  2. It is not moved sideways with people on it (unless engineered for it, or a mobile scaffold used under its own rules). 1926.451(f)(5)

  3. No work in storms or high winds unless a competent person has decided it is safe and workers have fall arrest or wind screens. 1926.451(f)(12)

  4. Loads hoisted onto or near the scaffold that could hit it are controlled with tag lines. 1926.451(f)(9)

Result

Answer each check and the result shows here. N/A is for checks that do not apply to this scaffold.

Everything runs in your browser; nothing you type is sent to us. Each check summarizes the 29 CFR paragraph next to it, and the standard is the authority. It does not replace the competent person's judgment.

Scaffold inspection checklist PDF and Word

The same 34 checks as a blank form to print and fill in by hand: each check with its 29 CFR paragraph, Yes / No / N/A boxes, a box for what needs fixing and a sign-off line.

When a scaffold must be inspected

The inspection rule is one sentence in OSHA's construction scaffold standard:

“Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.”

So the checklist is a daily job, not a weekly one, and it runs again after anything that could have weakened the scaffold: a load or vehicle hitting it, high winds, or someone changing it. Suspension scaffold ropes get their own inspection on the same schedule. [OSHA]

Who inspects: the competent person

OSHA's construction definitions set out who that is:

“Competent person means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.”

The second half matters on a scaffold: the person inspecting must be able to stop its use and get it fixed. A competent person also supervises any erecting, moving, altering or dismantling, done by trained workers that person selects. [OSHA] Everyone who works on the scaffold needs training from a qualified person on its electrical, fall and falling-object hazards, and retraining when the site or the scaffold type changes. [OSHA]

The free scaffold inspection checklist, PDF or Word.

What this scaffold inspection checklist covers

The 34 checks follow how an inspector walks a supported scaffold (frame, tube and coupler, system scaffolds and the like): who inspected and erected it, the footing and structure, the platforms, access, fall protection and falling objects, and what is around it. Each check is phrased so that Yes means it meets the rule, and each shows the paragraph of 29 CFR 1926.451 or 1926.454 it comes from.

It does not cover the extra rules for suspension scaffolds (ropes, hoists, tiebacks) or the type-specific rules for mobile, pump jack, ladder jack and other scaffolds in 1926.452. [OSHA] If you use one of those, add the rules for that type before you rely on the checklist.

Planning the scaffold work itself? The scaffold JSA example breaks erecting and working from a scaffold into steps with hazards and controls, and a free JHA template gives you a blank form for your own job. For the crew talk, the scaffold topics in the list of 100 and the daily scaffold topic each give one sourced point.

When a check fails

The standard is plain about damaged parts:

“Any part of a scaffold damaged or weakened such that its strength is less than that required by paragraph (a) of this section shall be immediately repaired or replaced, braced to meet those provisions, or removed from service until repaired.”

The strength paragraph it points to requires each scaffold and component to carry its own weight and at least 4 times the maximum intended load. [OSHA] For any other check marked No, write what needs fixing and who is fixing it in the box the tool opens, keep people off until it is fixed, and run the check again before the scaffold goes back into use.

Print it for the crew: free scaffold checklist, PDF or Word.

Questions

Common questions

How often does a scaffold need to be inspected?

Before each work shift, and again after anything that could affect its structural integrity, such as a vehicle strike, a storm or someone altering it. That is 29 CFR 1926.451(f)(3), and the inspection is done by a competent person.

Who can inspect a scaffold?

A competent person: someone able to spot existing and predictable hazards and who has the authority to fix them right away. The same rule set requires a competent person to supervise erecting, moving, altering or dismantling a scaffold.

At what height does a scaffold need fall protection?

Each worker on a scaffold more than 10 feet above a lower level must be protected from falling, by guardrails or a personal fall arrest system depending on the scaffold type. Guardrail top rails on supported scaffolds placed in service after January 1, 2000 sit 38 to 45 inches above the platform.

What is the 4 to 1 rule for scaffolds?

A supported scaffold more than four times as tall as its base is wide has to be restrained from tipping by guys, ties or braces. They go where the manufacturer says, or at the 4:1 height and then every 20 feet for scaffolds 3 feet wide or less, every 26 feet for wider ones.

Does OSHA require a written scaffold inspection record or a scaffold tag?

We found no written record or tag requirement in 29 CFR 1926.451; it requires the inspection itself. Many general contractors ask for a signed checklist or use green and red tags anyway, so check your site rules. The printout from this tool has a sign-off line for that.

Can I print a blank scaffold inspection checklist?

Yes. Download the free PDF or Word version on this page, or press "Print the checklist" in the tool without answering anything. Both give every check with its 29 CFR paragraph, Yes / No / N/A boxes and a signature line.