Instant download · PDF and Word
Filled JHA examples: 40 completed job hazard analyses for construction
Every JHA in this library is already written: the steps of the task, the hazards in each step, the controls, the PPE, the training it needs and the OSHA construction rules that apply. Open the one for today's task, fill in your site details, check it against the job and go over it with the crew. New to JHAs? Start with how a job hazard analysis works.
- 40 tasks in 9 trade groups, 254 steps
- Every rule with its 29 CFR 1926 section
- Editable Word files and print-ready PDFs
- Crew sign-on sheet in every JHA
What is in each JHA
The same parts in every one, in the same order
Job facts to fill in
Company, site, location, today's conditions, state, who prepared it and the date, as lines to fill in on site.
The steps, in work order
Five to seven steps per task, written the way a crew does the work, from setup to cleanup.
Hazards and controls for each step
What can go wrong and the harm it causes, then the controls, sorted from removing the hazard down to protective equipment.
PPE, training and competent person
The protective equipment for the job, and each training or competent person duty from the rules that apply to the task.
The OSHA rules that apply
Each rule with its 29 CFR 1926 section number and a plain-words line. Controls with no rule behind them are written as good practice.
Before-work checklist and sign-on
Highlighted lines to confirm for your site (911 address, hospital, rescue plan where needed) and a crew sign-on sheet.
The task list
All 40 tasks, by trade
Ladders, scaffolds and lifts
- L01Working from an extension ladder
- L02Working from a stepladder
- L03Erecting and dismantling a frame scaffold
- L04Working from a supported scaffold
- L05Working from a boom lift
Roofing
- L06Tearing off asphalt shingles on a house roof
- L07Installing asphalt shingles with nail guns
- L08Replacing a low-slope roof membrane
- L09Installing skylights and covering roof openings
- L10Torch-applied modified bitumen roofing
Excavation and sitework
- L11Trench excavation with a trench box
- L12Digging near underground utilities with an excavator
- L13Laying pipe in a trench
- L14Backfilling and compacting a trench
Concrete and masonry
- L15Building and stripping concrete wall forms
- L16Placing and tying rebar
- L17Pouring concrete with a pump truck
- L18Cutting and coring concrete
- L19Laying a concrete block wall
- L20Fastening with a powder-actuated tool
Carpentry, drywall and painting
- L21Framing and raising walls on a house with nail guns
- L22Cutting lumber with circular and miter saws
- L23Hanging and finishing drywall
- L24Installing floor sheathing over open joists on a house
- L25Exterior painting from a boom lift
Electrical
- L26Replacing an electrical panel
- L27Setting up temporary power on a jobsite
- L28Electrical rough-in: pulling wire and installing branch circuits
Welding, cutting and demolition
- L29Arc welding on a construction site
- L30Cutting with an oxy-acetylene torch
- L31Grinding and cutting metal with an angle grinder
- L32Interior demolition of walls and ceilings
- L33Removing debris through a chute from upper floors
Equipment, cranes and traffic
- L34Loading and unloading materials with a rough-terrain forklift
- L35Making a lift with a mobile crane
- L36Rigging, signaling and landing a crane load
- L37Operating a skid steer loader
- L38Flagging traffic in a road work zone
Confined spaces and lead
- L39Entering a permit-required confined space
- L40Lead-safe paint removal during renovation
Task not in the library?
Tell us the job and your crew's steps, and we write the JHA for that task, with the rules picked from your answers. Get a Custom JHA ($29)
A full sample from the library
L11: Trench excavation with a trench box
This is the complete JHA as it comes in the library, shown here as a web page. The download has it as a PDF and an editable Word file. Three of the library JHAs, this one included, are free on our JHA examples page.
Job Hazard Analysis
Trench excavation with a trench box
- Company
- ________________________
- Site or project
- ________________________
- Location on site
- ________________________
- Conditions today
- ________________________ (weather, ground, access, other work nearby)
- Task
- Trench excavation with a trench box
- Trade
- Excavation
- State
- ________________________
- Work type
- Construction (29 CFR Part 1926)
- Prepared by
- ________________________
- Date of the work
- ________________________
- Library reference
- L11, Excavation and sitework
- This JHA is filled in for the task as it is usually done. Walk the job: cross out what does not apply, and add any step, hazard or control your site needs.
- Fill in every highlighted line before work starts. In the Word file you can type them in.
- Go through each step with the crew at the start of the shift, on site, before anyone starts work.
- Have everyone who does the work sign the crew sign-on sheet. Keep a copy on site.
- It follows federal OSHA construction rules (29 CFR Part 1926). In a State Plan state, check your state's rules as well.
Before work starts
Highlighted lines must be filled in or confirmed for your site before anyone starts work.
- Confirm whether a hospital or clinic can be reached quickly from this site.
- Person in charge on site: ________________________
- Address or location to give 911 callers: ________________________
- Nearest hospital or clinic: ________________________
- Person on site with valid first-aid training: ________________________
- Competent person for the excavation: ________________________
- How and when underground utilities were located: ________________________
- Cave-in protection to be used, and who selected it: ________________________
Protective equipment for this job
- Hard hat
- Safety glasses
- High-visibility vest
- Safety-toe work boots
- Hearing protection near the excavator
- Work gloves
Training and competent person
Step by step
Step 1. Call in the utility locate and mark out the trench
- Digging into a gas, electric, water or communication line (explosion, electrocution, flooding, service outage)
Work practices and checks
- Contact the utility locate service before digging, describe the work, and wait until the marks are in.
- Mark out the trench line in white, and check the locate marks against the drawings and what you see on site.
- Look for private lines the locate service does not mark, such as site lighting, irrigation and lines to outbuildings.
Step 2. Set up the site, the spoil area and the equipment path
- Spoil or equipment too close to the trench edge (cave-in, or material rolling onto workers)
- Workers on foot in the excavator swing area (struck or crushed by the machine)
- Open trench left unguarded (falls into the trench by workers or the public)
Guards, barriers and equipment
- Mark off the excavator swing area and keep workers on foot out of it.
- Fence or barricade the trench area and post warning signs.
Work practices and checks
- Plan the spoil pile at least 2 feet back from the edge, on the side away from where the crew works.
Step 3. Dig the trench with the excavator
- Bucket strikes a marked line near the estimated location (line damage, explosion or electrocution)
- Machine near the edge undermines the trench wall (cave-in or machine tipping in)
- Workers under the bucket or next to trucks being loaded (struck by the load or spillage)
- Engine and bucket noise (hearing loss)
Work practices and checks
- Near a mark, stop and expose the line by hand or vacuum excavation before digging with the machine.
- Keep everyone out from under the bucket and away from trucks being loaded.
- Keep the excavator tracks back from the edge as far as its reach allows.
- Wear the seat belt, and sound the horn before moving.
Protective equipment
- Wear hearing protection near the running machine.
Step 4. Set the trench box
- Entering the trench before the box is in (cave-in, burial)
- Box set on uneven ground or with gaps to the trench wall (box shifts or soil falls in)
- Box swung or lowered over workers (struck or crushed)
Remove the hazard
- Nobody enters the trench until the box is set. Set it from the top with the excavator.
Work practices and checks
- Use a box with the maker's tabulated data for this depth, and set it as the data says.
- Keep everyone clear while the box is lifted and lowered, and use rigging inspected that shift.
Step 5. Place the ladder and inspect the trench before entry
- No quick way out (workers trapped by water, a cave-in or a gas leak)
- Cracks, bulges, seepage or rain since the last check (cave-in)
- Low oxygen or exhaust gas in a deep trench (unconsciousness or death)
Guards, barriers and equipment
- Place a ladder inside the box so no one travels more than 25 feet to get out, and extend it above the top.
Work practices and checks
- The competent person inspects the trench and the box before anyone enters, as needed during the shift, and after rain.
- Where a hazardous atmosphere could be present, test the air before entering a trench deeper than 4 feet.
- Keep engines and generators away from the trench so exhaust cannot collect in it.
Step 6. Work inside the trench
- Standing outside the box or at its open ends (cave-in, burial)
- Water collecting in the bottom (slips, soil failure and drowning risk)
- Tools or material dropped from the top (head injuries)
Work practices and checks
- Stay inside the box at all times. Enter and leave only by the ladder inside the box.
- Stop work and get out if water is collecting, until it is pumped down and the competent person has re-inspected.
- Lower tools and material in a bucket or sling, never throw them in.
Protective equipment
- Wear a hard hat and safety glasses.
Step 7. Pull the box and backfill
- Workers in the trench while the box is moved (cave-in or struck by the box)
- Machine backing over a worker on foot (crushing)
Work practices and checks
- Everyone is out of the trench before the box is moved or pulled.
- Backfill in lifts as the box comes up, and use a spotter when backing.
Rules that apply to this job
Each rule in plain words. The regulation text itself is at osha.gov under the section number.
Crew sign-on
The last page has a sign-on table: name, signature and date for each crew member who reviewed the JHA.
Questions
Common questions, short answers
Something not covered here? Email help@jobstepsafety.com and we will answer.
Ready when you are
Get the libraryWhat is a filled JHA example?
A job hazard analysis that is already written for a task: the steps, the hazards in each step, the controls, the PPE and the rules. You check it against your job, fill in the site lines, add anything your site needs, and review it with the crew. A blank template gives you the columns; a filled example gives you the content.
How is this different from the free JHA examples page?
Our free JHA examples page walks through the two worked examples OSHA itself publishes, in OSHA's words, plus three of the library JHAs as free downloads. The library is all 40 construction tasks as finished, editable Word and PDF files.
How is it different from a Custom JHA?
The library covers common tasks the way they are usually done, ready to download now. A Custom JHA ($29) is written for your own task and the steps your crew gives us, with the rules picked from your answers. If your task is not in the library, or it is done in an unusual way, the Custom JHA fits better.
Where do the OSHA rules come from?
From the construction standards, 29 CFR Part 1926 (and 29 CFR 1910.178(l) and 1910.134 where Part 1926 points to them). Each rule is printed with its section number and a plain-words line, and every one is checked word for word against our saved copy of the regulation text. A control that no rule requires is written as a plain good-practice step, never as an OSHA requirement.
Can I edit them?
Yes. Every JHA comes as an editable Word file and a PDF. Add your company name, cross out steps that do not apply, and add your own steps, hazards and controls.
Do they work in every state?
They follow the federal OSHA construction rules. If you work in a State Plan state, such as California, Washington or Michigan, your state's rules can differ or go further, so check them as well.
Is this a subscription?
No. One payment, and the files are yours to keep and print. If the library is not right for you, email us within 14 days for a full refund.
A JHA ready for the next task, before the crew arrives
Get the library, $29