When a written fall protection plan is allowed
Start with the default. In construction, the basic rule covers any open side or edge at least 6 feet above the next level down: the worker there needs a guardrail system, a safety net system or a personal fall arrest system. [OSHA] A written plan is the exception, and the standard says exactly who can use it:
“This option is available only to employees engaged in leading edge work, precast concrete erection work, or residential construction work (See § 1926.501(b)(2), (b)(12), and (b)(13)) who can demonstrate that it is infeasible or it creates a greater hazard to use conventional fall protection equipment.”
The burden sits with the employer. Each of those three paragraphs carries the same note: OSHA presumes at least one conventional system is feasible and safe, and the employer has to show otherwise before a plan replaces them. [OSHA] So if a harness and anchor, a net or a rail can work for part of the job, use it there and keep the plan for the spots where none can.
| Kind of work at 6 feet or more | Rule | Can a 1926.502(k) plan replace conventional systems? |
|---|---|---|
| Leading edge work | 1926.501(b)(2)(i) | Yes, if the employer can show conventional systems are infeasible or create a greater hazard |
| Precast concrete erection | 1926.501(b)(12) | Yes, if the employer can show conventional systems are infeasible or create a greater hazard |
| Residential construction | 1926.501(b)(13) | Yes, if the employer can show conventional systems are infeasible or create a greater hazard |
| Unprotected sides and edges in other work | 1926.501(b)(1) | No. Guardrail, safety net or personal fall arrest |
For the crew briefing on the everyday rules, use the fall protection toolbox talk: edges, holes, harness checks and the rescue plan, ready to read aloud.
What a fall protection plan must include
Paragraph (k) lists ten provisions. This table puts each one in plain words and shows where the builder puts your answer. The full text of the first one:
“The fall protection plan shall be prepared by a qualified person and developed specifically for the site where the leading edge work, precast concrete work, or residential construction work is being performed and the plan must be maintained up to date.”
| Paragraph | What it requires | Where it goes in the plan |
|---|---|---|
| 1926.502(k)(1) | Prepared by a qualified person, written for this one site, and kept up to date. | Plan details: prepared by, site, date |
| 1926.502(k)(2) | Any change to the plan is approved by a qualified person. | Change record at the end |
| 1926.502(k)(3) | A copy with all approved changes is kept at the job site. | Plan details: where the copy is kept |
| 1926.502(k)(4) | A competent person supervises how the plan is carried out. | Plan details: competent person |
| 1926.502(k)(5) | Says why guardrails, personal fall arrest and safety nets are infeasible here or would create a greater hazard. | Section 1 |
| 1926.502(k)(6) | Discusses the other measures that will reduce or remove the fall hazard, such as scaffolds, ladders or vehicle mounted work platforms. | Section 2 |
| 1926.502(k)(7) | Names each location where conventional fall protection cannot be used. Each one becomes a controlled access zone under 1926.502(g). | Section 3 |
| 1926.502(k)(8) | Where no other measure is in place, uses a safety monitoring system under 1926.502(h). | Section 4 |
| 1926.502(k)(9) | Names (or otherwise identifies) each worker allowed in the controlled access zones. Nobody else goes in. | Section 5 |
| 1926.502(k)(10) | After a fall or a related serious incident such as a near miss, the employer investigates, decides whether the plan must change, and makes the change. | Section 6 |
Two of those rows point to other paragraphs. A controlled access zone follows 1926.502(g): it is marked by a control line or another means that restricts access, and a control line is set 6 to 25 feet back from the edge (6 to 60 feet, or half the member length, for precast erection). [OSHA] A safety monitoring system follows 1926.502(h): the monitor is a competent person on the same surface, in sight and in talking range of the workers, with no other duties that pull their attention away. [OSHA] The printout lists those rules under the matching section so the crew sees them too.
Fall protection plan template: what the printout holds
Press "Print the plan" and you get a fall protection plan template filled in with your answers: a details table (company, site, who prepared it, who supervises it, where the copy is kept), then six numbered sections that follow paragraph (k) from the reasons to the incident review. It closes with a change record and signature lines. Leave a field blank and it prints as a line, so the same button also gives you a blank template to fill in by hand. Choose "Save as PDF" in the print window for a file copy.
OSHA's own sample plans in Appendix E to Subpart M are a useful read before you write the reasons. OSHA labels them as non-mandatory guidelines and warns that their reasons are examples only:
“The reasons outlined in this sample fall protection plan are for illustrative purposes only and are not necessarily a valid, acceptable rationale”
In other words, copy the structure, not the excuses. Write what is true at your site: the roof pitch, the lack of an anchor point, the stage of framing, or whatever actually stops each system from working.
Qualified person and competent person
The plan needs both. A qualified person prepares it and approves every change. OSHA defines that person as:
“Qualified means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.”
A competent person supervises the plan on site. [OSHA] That person can recognize hazards that exist now or can be predicted, and is authorized to correct them promptly. [OSHA] Name both in the builder so their names print on the plan, and the crew knows who to ask.
How the fall protection plan builder works
- Pick the work. Tick leading edge, precast concrete or residential construction. If none fits, the tool tells you a plan is not an option.
- Fill in the details. Company, site, the qualified person, the competent person and where the copy will live.
- Give a reason for each system. One box each for guardrails, personal fall arrest and safety nets.
- Add the other measures, zones and people. Safer working surfaces, each location without conventional protection, how it is marked, the safety monitor and who may enter.
- Check the list and print. The tool lists every element still blank with its paragraph. Print, sign and keep the copy at the site.
Planning the task itself as well? A construction JHA breaks the work into steps with hazards and controls, and the risk assessment matrix scores each fall hazard before and after controls. If you build scaffolds as one of your other measures, run the scaffold inspection checklist before each shift.