Plan details
1. Reporting and 2. alarm
3. Evacuation
4. Critical operations, 5. head count, 6. rescue
7. Who to ask about the plan

Your plan

11 items are still blank. They print as lines to fill in by hand.

  • The company and site address 1910.38(b)
  • How to report an emergency (who to call) 1910.38(c)(1)
  • The alarm signal 1910.38(d)
  • The type of evacuation 1910.38(c)(2)
  • The exit routes and who uses them 1910.38(c)(2)
  • The assembly point 1910.38(c)(4)
  • The people trained to help others evacuate 1910.38(e)
  • Critical operations (or "none, everyone leaves at once") 1910.38(c)(3)
  • How the head count is taken 1910.38(c)(4)
  • Rescue and medical duties (or "none, we call 911") 1910.38(c)(5)
  • Who to ask about the plan (name or job title) 1910.38(c)(6)

Everything runs in your browser; nothing you type is sent to us. The tool lays out your answers under the paragraph each one meets. It does not check your site, and the standards are the authority.

What an emergency action plan must include

OSHA's general industry rule lists six minimum elements. The first line of the list reads:

“Minimum elements of an emergency action plan. An emergency action plan must include at a minimum:”

This table gives each element in plain words, the matching paragraph in the construction rule, and the section of the printed plan that answers it. [OSHA] [OSHA]

Element1910.381926.35Plan section
How to report a fire or other emergency1910.38(c)(1)1926.35(b)(5)1. Reporting an emergency
How to evacuate: the type of evacuation and who uses which exit route1910.38(c)(2)1926.35(b)(1), (d)3. Evacuation
What anyone who stays behind to run critical operations does before they leave1910.38(c)(3)1926.35(b)(2)4. Critical operations
How everyone is accounted for after the evacuation1910.38(c)(4)1926.35(b)(3)5. Head count
What workers with rescue or medical duties do1910.38(c)(5)1926.35(b)(4)6. Rescue and medical duties
The name or job title of who to ask about the plan or their duties1910.38(c)(6)1926.35(b)(6)7. Who to ask
An employee alarm system, with a distinctive signal for each purpose1910.38(d)1926.35(c)2. Alarm
Enough people designated and trained to help others evacuate safely1910.38(e)1926.35(e)(1)3. Evacuation
The plan reviewed with each employee when it is made or they start, when their duties change, and when the plan changes1910.38(f)1926.35(e)(2)8. Review record
Kept in writing at the workplace for employees to see; 10 or fewer employees may be told the plan orally1910.38(b)1926.35(e)(3)Plan details

Emergency action plan for construction: 1926.35

Construction has its own version of the rule. It asks for the same six elements in slightly different words, with a separate paragraph saying the plan sets out the types of evacuation to use. [OSHA] Its scope line:

“This section applies to all emergency action plans required by a particular OSHA standard.”

It also covers the small-crew case, as 1910.38(b) does. Here is the 1926.35 sentence:

“For those employers with 10 or fewer employees the plan may be communicated orally to employees and the employer need not maintain a written plan.”

Even then, a one-page printout is the easiest way to make sure every person hears the same routes, signal and assembly point. Pair it with the free safety meeting sign-in sheet when you walk the crew through it.

When you need an emergency action plan

Both rules start the same way: the plan is required when another OSHA standard calls for one.

“An employer must have an emergency action plan whenever an OSHA standard in this part requires one.”

A general contractor or owner may also ask for one in your contract, and it is a short document to keep. If a specific standard applies to your work, check what that standard adds on top of these minimum elements.

Filling in the emergency action plan template

OSHA's evacuation eTool gives practical advice for each part. On exit routes, it says most employers mark them on a map of the site and post it where everyone can see. For the head count, it suggests assembly areas with room for everyone, away from busy streets, and a roll call afterward:

“Take a head count after the evacuation. Identify the names and last known locations of anyone not accounted for and pass them to the official in charge.”

It also says visitors should be accounted for, and that some employers use the sign-in list for this. [OSHA] On a job site, the daily sign-in sheet or the gate log can be your roll. For critical operations, the eTool notes that most small businesses evacuate everyone at once when the alarm sounds; if someone has to stay behind briefly, the plan describes in detail what they do. [OSHA]

For the crew meeting, the safety meeting topics page has a short talk on the emergency action plan and one on severe weather, each with a question to open the discussion.

How the emergency action plan builder works

  1. Fill in the details. Company, site address, plan date and how many employees you have.
  2. Reporting and alarm. The number to call, who to tell next, and the signal everyone knows.
  3. Evacuation. Pick the type, then write the exit routes, the assembly point and who helps others get out.
  4. Critical operations, head count and rescue. Say who stays and what they do, how the roll is taken, and who handles first aid.
  5. Print and review. The tool lists any element still blank. Print, walk the crew through it, and have each person sign the review record.

Working at height on the same job? The fall protection plan builder lays out a written plan for leading edge, precast and residential work, and the risk assessment matrix helps you rank the hazards you plan for.

Questions

Common questions

What should be included in an emergency action plan?

At a minimum: how to report a fire or other emergency, how to evacuate (the type of evacuation and the exit route assignments), what anyone running critical operations does before leaving, how everyone is accounted for, what workers with rescue or medical duties do, and who to ask about the plan. The same rule also calls for an alarm system, trained helpers and a review with each employee.

Does an emergency action plan have to be written?

When a plan is required and you have more than 10 employees, yes: it is written, kept at the workplace and available for employees to read. An employer with 10 or fewer employees may communicate the plan orally instead. Both 1910.38 and the construction rule, 1926.35, say this.

Is an emergency action plan required for construction sites?

The construction rule, 29 CFR 1926.35, applies to every emergency action plan that another OSHA standard requires. So the duty comes from a specific standard, not from 1926.35 alone. A general contractor or owner may also ask for one before you start, and the builder on this page works for either case.

How often should an emergency action plan be reviewed with employees?

When the plan is first made or the employee is first assigned, whenever that employee's duties under the plan change, and whenever the plan itself changes. The printout from this tool has a review record with a line for each employee to sign.

What is the difference between an emergency action plan and a fire prevention plan?

An emergency action plan says what people do when an emergency happens: report it, evacuate, count heads. A fire prevention plan is a separate OSHA plan about stopping fires before they start. This tool builds the emergency action plan only.

Is this emergency action plan template free to use and edit?

Yes. Fill in as much as you know, print it or save it as a PDF, or copy it as text into your own document and edit it there. Anything you leave blank prints as a line to complete by hand.

More free safety tools

  • Risk assessment matrix: Click a 5x5 or 3x3 grid to score a hazard by severity and likelihood, before and after controls.
  • Scaffold inspection checklist: Answer the OSHA 1926.451 checks for a supported scaffold on your phone, see what is not met, copy a record or print the checklist with a sign-off line..
  • Fall protection plan builder: Build the written, site-specific plan OSHA 1926.502(k) allows for leading edge, precast and residential work.
  • JHA template: A free job hazard analysis form in Word and PDF, laid out the way OSHA's sample form is, ready to print for the crew..
  • JSA template: A free job safety analysis form in Word and PDF: job steps, hazards and safe procedures, ready to print..
  • Incident report form, online: Fill in the free incident report form on your phone.
  • Toolbox talk topic picker: Tick what the crew is doing today and get the ready talks that fit, five sourced OSHA topics to build a talk around, and what the season adds..
  • Safety topic of the day: Today's two-minute safety talk, picked by date from a 31-day rotation, with the next six days listed so you can plan ahead..
  • All free safety tools for contractors

Sources