JobStep Safety
  • Sourced from OSHA
  • Updated November 2026
  • Every quote checked word for word
MondayTopic
Feb 1Silica dust in closed-in buildings
Feb 8First aid on site: who, where and which number
Feb 15Back strain on cold, slippery days
Feb 22Cords and GFCIs in wet, thawing conditions

Week 1 (Feb 1): Silica dust in closed-in buildings

Why this week: Cutting and grinding move indoors, behind closed doors and plastic, where dust has nowhere to go.

Cutting block, grinding concrete and chasing walls make fine silica dust. Outside, wind carries some of it away. Inside a building that is wrapped and heated for winter, it hangs in the air the crew breathes. The construction silica rule says what to do about it.

Indoors, move the air. When a task runs inside, the rule asks for this:

“For tasks performed indoors or in enclosed areas, provide a means of exhaust as needed to minimize the accumulation of visible airborne dust”

Wet the cut. For saws, the rule's control table starts here:

“Use saw equipped with integrated water delivery system that continuously feeds water to the blade”

In the cold, plan for the water: keep the supply from freezing and the floor from icing where the slurry runs. Other tools in that table use a vacuum dust collector instead of water; follow the line for the tool you are running. [OSHA]

Clean up without making more dust.

“The employer shall not allow dry sweeping or dry brushing where such activity could contribute to employee exposure to respirable crystalline silica unless wet sweeping, HEPA-filtered vacuuming or other methods that minimize the likelihood of exposure are not feasible.”

Blowing dust off clothes or surfaces with compressed air is out too, unless a ventilation system captures the dust cloud it makes. [OSHA] Every employer covered by the rule also keeps a written exposure control plan that lists the tasks that make silica dust and how each is controlled. [OSHA]

Ask the crew:

  1. Which tasks this week will cut, grind or drill concrete, block or stone indoors?
  2. Where does the dust go when we run them, and what moves the air in this room?

Week 2 (Feb 8): First aid on site: who, where and which number

Why this week: Short days and icy access roads make help slower to reach the job.

In winter, an ambulance takes longer: icy roads, snow on the access road, a gate nobody can find in the dark. That makes the first few minutes on site matter more. The construction first aid rule covers three things the crew should know.

Who is trained. If there is no clinic, hospital or doctor reasonably close in time and distance,

“a person who has a valid certificate in first-aid training from the U.S. Bureau of Mines, the American Red Cross, or equivalent training that can be verified by documentary evidence, shall be available at the worksite to render first aid.”

Where the kit is.

“First aid supplies shall be easily accessible when required.”

The kit itself goes in a weatherproof container, and it is checked before it goes out to each job and at least weekly, so used items get replaced. [OSHA] A Monday talk is a good time to open it.

Which number to call. Where 911 does not reach the site, the rule is plain:

“telephone numbers of the physicians, hospitals, or ambulances shall be conspicuously posted.”

Where anyone may be exposed to corrosive materials, there must also be a way to flush the eyes and body right in the work area. [OSHA] Afterward, write it up: the free incident report form takes ten minutes.

Ask the crew:

  1. Who on this site today has a current first aid card?
  2. Where is the kit, and what is the site address you would give the dispatcher?

Week 3 (Feb 15): Back strain on cold, slippery days

Why this week: Stiff muscles, heavy layers and bad footing turn an ordinary lift into an injury.

Most back injuries on a job do not come from one heavy lift. OSHA's technical manual lists what builds up to them, and several of these get worse in February:

“Twisting while lifting. Bending while lifting. Maintaining bent postures. Heavy lifting. Fatigue. Poor footing such as slippery floors, or constrained posture.”

What that means this month:

  • Clear the path first. Ice, slush and wet plastic under a load are the poor footing on that list.
  • Turn with your feet, not your back, when you set a load down.
  • Get help or a cart for awkward or heavy items instead of carrying them alone in heavy winter layers.
  • Rotate repeated lifting through the day, because fatigue is on the list too.

The same chapter describes the warning signs: pain when trying to stand up straight, less movement, and pain when standing or getting up from sitting. [OSHA] It also says training should include how to report hazards and how to report injuries early. [OSHA] Say who to tell, and that early reports are welcome. Walkways, stairs and ice have their own talk: slips, trips and falls.

Ask the crew:

  1. Which load this week is the awkward one, and who is helping with it?
  2. Where on this site is the footing worst when you are carrying something?

Week 4 (Feb 22): Cords and GFCIs in wet, thawing conditions

Why this week: Snowmelt puts water where the cords run, on the floor and in the boxes.

The thaw puts water where the temporary power runs: puddles on slabs, wet boxes, cords lying in slush. Water and damaged cords are how people get shocked. Two rules cover most of it.

GFCI on every temporary outlet.

“All 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection.”

The right cord, in one piece.

“Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage.”

“Flexible cords shall be used only in continuous lengths without splice or tap.”

Cords may run through doorways and other pinch points only if something protects them from damage there. [OSHA] In February, keep cords and connections up out of standing water, and pull any cord with a cut jacket or a taped splice out of use. The full electrical safety talk covers power lines and lockout.

Ask the crew:

  1. Which outlet on this site are you not sure has a GFCI? Test it before you plug in.
  2. Where are cords lying in water or crossing a doorway right now?

Questions

Common questions

What are good safety topics for February?

Pick what late winter changes on a job: dusty work moving inside closed-in buildings, help taking longer to arrive, cold muscles and slippery footing, and meltwater around cords and temporary power. This page has one talk on each for the Mondays of February 2027, with two questions for the crew after each.

What are good February toolbox talks for a construction crew?

The four on this page: silica dust from cutting and grinding indoors, first aid and emergency numbers on site, back strain from lifting on cold and slippery days, and extension cords and GFCIs where snowmelt gets to them. Each takes five to ten minutes.

What is a good February safety moment?

One minute from this month's talks. Two that fit: before you plug in, look at the cord and the box for water and damage, and use only a GFCI-protected outlet. And before you lift, look at where your feet will be, because a slip with a load in your hands is how backs get hurt.

Do I still need the cold stress and winter driving talks in February?

Yes, if you have not given them this winter. They are on the November page: temporary heaters and carbon monoxide, cold stress, winter driving, and snow and ice. December covers storms and roof snow, and January covers fire around temporary heat and vibrating tools.

How long should each talk take?

About five to ten minutes. Read the points, ask the two questions at the end of each week, and have everyone sign the sheet at the bottom of the page.

More toolbox talks and meeting help

Also useful

Sources