What stop work authority is
Stop work authority is a written promise from a company to everyone on its sites: if you see something you believe could hurt someone, you may stop that work, and nobody will hold it against you. The work restarts once the hazard is understood and fixed.
It matters because the person closest to a hazard is often the newest or most junior one there, and they are the least likely to speak up. A clear policy takes the guesswork out: the answer is always yes, stop it.
Is stop work authority a law?
No federal OSHA standard is called stop work authority. It is a company policy. The law sits underneath it in two places. First, the OSH Act bars retaliation against an employee for using the rights the Act gives:
“No person shall discharge or in any manner discriminate against any employee because such employee has filed any complaint or instituted or caused to be instituted any proceeding under or related to this Act or has testified or is about to testify in any such proceeding or because of the exercise by such employee on behalf of himself or others of any right afforded by this Act.”
Second, OSHA's rule on the right to refuse dangerous work protects a worker who refuses in good faith when there is no reasonable alternative:
“If the employee, with no reasonable alternative, refuses in good faith to expose himself to the dangerous condition, he would be protected against subsequent discrimination.”
That protection comes with conditions. The danger has to be one that any reasonable worker in the same spot would see as a real risk of death or serious harm. It has to be too urgent to wait for an inspection. And, where it can be done, the worker must have asked the employer to correct it and been refused. [OSHA] OSHA also tells workers to stay at the worksite until ordered to leave, and to contact OSHA within 30 days if they are retaliated against. [OSHA]
A stop work policy sets a lower and simpler bar than the law: you do not need to be sure it is deadly, you only need to believe it is unsafe. That is the point. It catches problems long before anyone would need the legal right to refuse.
The five steps of a stop work process
- Stop. Say "stop" clearly, and make the immediate area safe if you can do it without putting yourself at risk.
- Tell. Tell the people doing the work and the foreman or supervisor what you saw.
- Look together. The supervisor and the crew look at the hazard and agree what is wrong. If it is outside the crew's work, bring in whoever controls it: the general contractor, another trade, the crane operator.
- Fix it. Remove or control the hazard. Tag or remove unsafe tools and equipment so nobody uses them by mistake. [OSHA]
- Restart and record. The supervisor restarts the work once the crew agrees it is safe. Write down what was stopped, why, and what was done, and thank the person who called it. If someone was hurt or nearly hurt, also fill in an incident report form.
Six stop work examples from construction sites
A trench with no protection
A pipe crew is about to climb into a trench about 6 feet deep, with straight walls and no box or shoring. At 5 feet or deeper, a protective system is required unless the excavation is made entirely in stable rock, so anyone on the crew can stop the entry until protection is in. [OSHA]
An open floor edge
The guardrail at a second floor slab edge was taken down to land material and not put back. A worker 6 feet or more above a lower level at an unprotected edge needs guardrails, a safety net or personal fall arrest, so work near that edge stops until the rail is back. [OSHA]
A frayed extension cord
The cord feeding a saw has a split jacket with copper showing. Worn or frayed cords may not be used, so the saw stops and the cord comes out of service. [OSHA]
A crane near a power line
A boom truck is setting trusses beside an overhead line and nobody has checked how close the boom or the load could get. Before the work starts the employer has to find out whether any part of the equipment, load line or load could come within 20 feet of the line at the crane's farthest working reach. Until that check is done, the lift waits. [OSHA]
Untied on a steep roof
A roofer walks out on a 9 in 12 roof without being tied off. On a steep roof with edges 6 feet or more above a lower level, workers need guardrails with toeboards, safety nets or personal fall arrest, so the foreman stops the work until the roofer is tied off. [OSHA]
Conditions changed
A storm rolls in during a steel lift, or the crew finds what looks like asbestos insulation behind a wall nobody planned to open. The plan the crew started with no longer matches the job. Stop, tell the foreman, and plan again before going on.
A stop work authority policy you can copy
Paste this into your safety manual and put your company name in it. Change the wording to fit how you work.
Stop Work Authority
Every person working on our sites, including our employees, our subcontractors and visitors, has the authority and the duty to stop any work they believe is unsafe.
You do not need permission to stop work. Say stop, make the area safe if you can, and tell the foreman or supervisor right away.
Work stays stopped until the supervisor and the crew agree the hazard has been fixed or controlled. Only the supervisor in charge restarts it.
Nobody will be disciplined, threatened or treated differently for stopping work in good faith, even if the hazard turns out to be smaller than it looked.
Every stop is written on the stop work log with what was found and what was done, and we go over them at toolbox talks so everyone learns from them.
Making it real on your jobs
- Say it on day one. Cover stop work authority in every new worker's orientation, and again for subcontractors when they arrive on site.
- Practice the words. At a toolbox talk, have the crew say out loud how they would stop a task. It is much easier the second time.
- Back it up visibly. The first time someone stops work, how the supervisor reacts decides whether anyone does it again. Thank them in front of the crew.
- Keep a log. A short log of stops shows the program is used, and patterns in it show where your planning keeps missing the same hazard.
- Check the GC's rules. Many general contractors run their own stop work program. On their sites, follow theirs as well as yours.
Questions
Common questions
Is stop work authority required by OSHA?
No OSHA standard is titled stop work authority. It is a company policy. What the law does give workers is protection: an employer may not punish an employee for exercising rights under the OSH Act, and a worker who refuses in good faith to face a real danger of death or serious injury, with no reasonable alternative and no time for an inspection, is protected against retaliation under 29 CFR 1977.12. A stop work policy goes further and invites people to stop work before it gets that far.
Who can stop work?
In a good policy, anyone on the site: every worker, foreman, subcontractor and visitor. The point is that the person who sees the hazard does not have to find someone with a title first.
Can a worker be disciplined for stopping work?
Not for stopping work in good faith. A company that wants people to speak up has to make that a written promise and keep it. The law also bars retaliation against a worker for reporting an injury, and against an employee for exercising rights under the OSH Act.
What if the person who stopped the work was wrong?
Thank them anyway. The check costs a few minutes; the injury it might have prevented costs far more. Explain what made the work safe, so the next call is better informed, and restart.
Who restarts the work?
The supervisor in charge, once the hazard is fixed or controlled and the people who do the work agree it is safe. Write down what was found and what was done.